1-hour TSP Monitoring Results              
Station CM_AB1a, The Hong Kong Ice and Cold Storage (Aberdeen)          
  Start Finish Weather  TSP Concentration  Action Level Limit Level Site Conditions / Temperature Wind Speed Sampler Filter
Date Time Time   (µg/m3) (µg/m3) (µg/m3) Observations / Remarks (°C) (m/s) ID ID
01-Nov-13 13:13 14:13 Fine 162 283 500 Tunnel works 25.5 <5 LD-3B-002 N/A
01-Nov-13 14:13 15:13 Fine 165 283 500 Tunnel works 25.5 <5 LD-3B-002 N/A
01-Nov-13 15:13 16:13 Fine 154 283 500 Tunnel works 25.5 <5 LD-3B-002 N/A
07-Nov-13 09:17 10:17 Fine 248 283 500 Tunnel works 24.1 <5 LD-3B-002 N/A
07-Nov-13 10:17 11:17 Fine 273 283 500 Tunnel works 24.1 <5 LD-3B-002 N/A
07-Nov-13 11:17 12:17 Fine 224 283 500 Tunnel works 24.1 <5 LD-3B-002 N/A
13-Nov-13 13:16 14:16 Fine 176 283 500 Tunnel works 20.7 <5 LD-3B-002 N/A
13-Nov-13 14:16 15:16 Fine 176 283 500 Tunnel works 20.7 <5 LD-3B-002 N/A
13-Nov-13 15:16 16:16 Fine 168 283 500 Tunnel works 20.7 <5 LD-3B-002 N/A
19-Nov-13 13:21 14:21 Fine 169 283 500 Tunnel works 20.2 <5 LD-3B-002 N/A
19-Nov-13 14:21 15:21 Fine 200 283 500 Tunnel works 20.2 <5 LD-3B-002 N/A
19-Nov-13 15:21 16:21 Fine 201 283 500 Tunnel works 20.2 <5 LD-3B-002 N/A
25-Nov-13 09:18 10:18 Fine 80 283 500 Operation of tower crane and loading 19.5 <5 LD-3B-002 N/A
25-Nov-13 10:18 11:18 Fine 78 283 500 Operation of tower crane and loading 19.5 <5 LD-3B-002 N/A
25-Nov-13 11:18 12:18 Fine 72 283 500 Operation of tower crane and loading 19.5 <5 LD-3B-002 N/A
29-Nov-13 13:17 14:17 Fine 51 283 500 Operation of tower crane and loading 15 <5 LD-3B-002 N/A
29-Nov-13 14:17 15:17 Fine 51 283 500 Operation of tower crane and loading 15 <5 LD-3B-002 N/A
29-Nov-13 15:17 16:17 Fine 55 283 500 Operation of tower crane and loading 15 <5 LD-3B-002 N/A
      Min.  51              
      Max.  273              
      Average  150